Let's connect!
1. Technology Leadership Global cryogenic technology expertise: Self-developed pipeline support systems (insulated pipe components/spring hangers) and thermal/cryogenic network transmission technologies reduce pipeline energy consumption by over 30% and pressure drop by25%.
View More1. Nationally Validated Mega Projects Executed Qinghai-Tibet Railway permafrost treatment (National Science & Technology Progress Award), world's first 160m five-cylinder flare (Sinopec Gulei Project), and Shenhua Yulin Circular Economy Base (national demonstration).
View MoreSector: High-End Special Equipment Core Solutions: Ultra-high-temperature (>650°C) cyclic supports, polysilicon cold hydrogenation reactors, high-efficiency heat exchangers (thermal efficiency +35%).
View More1.End-to-End Solutions Integrated "diagnosis-design-manufacture-O&M" services: e.g., pipeline vibration simulation analysis, custom vibration dampers, online retrofits (70% vibration reduction &15%+ energy savings).
View MoreTHE BEST PRODUCTS
Walk hand in hand, shape the future with you
China’s 1st 10Mt/a LNG Terminal (Tangshan Phase II) with Advanced Cryogenic Insulation
Sept 21, 2024: SHENGT supported China’s 1st 10Mt/a Tangshan LNG Terminal Phase II commissioning. It delivered 30km insulated pipelines (2km 48-inch cryo) in 139 days (10 days early) via prefabricated cryo insulation (30% higher efficiency, 15% better material use), meeting ASTM C177-19/EN 1473.
Award-Nominated Pipeline Solutions & Winter Olympics Cold Preservation Leader
SHENGT Pipeline (one-stop pipeline energy-saving/safety solution leader) was nominated for 2021 Jiangning Quality Award. It leads in R&D, with products (pipe racks, spring hangers) replacing imports, winning "Jiangsu High-Quality Products". It exclusively supplied cold preservation tech for Beijing 2022 Winter Olympics’ bobsled center.
4-Month Fast-Track Steam Pipeline Network Project (Wenshang, Shandong)
SHENGT undertook Shandong Wenshang’s steam pipeline network project via integrated design-construction. Phase 1 (12km) was fully delivered in 4 months (Aug-Dec): 200m daily pipeline welding, 100% key milestone compliance. The network is now ready for immediate steam supply, showcasing its petrochemical engineering EPC capabilities
About Company
Jiangsu Shengtai Energy Network Technology Co., Ltd. (abbreviated as "SHENGT"), founded in 1997, is a nationally recognized "Specialized, Sophisticated, Distinctive and Innovative ‘Little Giant’ Enterprise". Guided by our commitment to energy-efficient and secure energy storage and transmission, we specialize in advanced pipeline energy-saving and safety solutions—including thermal insulation, cold preservation...
View More